Skip to content

UNJLC

Sections
Personal tools
You are here: Home » Archives » Lebanon 2006 » Land Operations » Road Assessments » El Aadbe Bridge, Aarida - 12/08/06

El Aadbe Bridge, Aarida - 12/08/06

Document Actions
Images
Approach El Aadbe Bridge Approach El Aadbe Bridge
Underneath El Aadbe Bridge Underneath El Aadbe Bridge
Underneath El Aadbe Bridge Underneath El Aadbe Bridge
Approach Arrida Bridge Approach Arrida Bridge
Underneath Arrida Bridge Underneath Arrida Bridge

There is a four lane bridge at N 34,32'59.57", E35,59'31.54",  approximately 4km North of  El Aabde.  This bridge has sustained two blasts, causing extensive structural damage. The bridge will not accept vehicles greater than GVM 5MT on the northbound lanes or the inside southbound lane. On the underside of the bridge the structural steel has delaminated from the concrete.  These lanes could fail under convoy loads.

Another two-lane bridge located at N34,34'50.75" E35,59'30.18" has sustained two blasts which have caused major damage. Currently traffic across the bridge is sharing a single lane, with loose sand and mud filling the crater.  Soil movement can be observed underneath multi-axle trucks.  Underneath the bridge, sand being used to fill in the hole is being eroded by the water.

Attachments
 Modified   Published   Title   Source   Download 
2006-Aug-23 PDF version of this Assessment
PDF version of this Assessment (UNJLC_LBN_RoadAssessmentArrida_060812.pdf - 100.66 Kb)
Source : WFP
Activities : Land
Type of document : Snapshot
Country : LB LBN 422 Lebanon, Lebanese Republic
Location : Aarida
Publication date 2006-Aug-23
 

Powered by Plone

This site conforms to the following standards: